Bridges and Culverts
Crossings designed and built as part of wider road and drainage schemes.
What we do
Box and pipe culverts, drifts and bridges that carry roads over streams and drains.
Most of the road network in Ghana depends on small crossings: culverts, drifts and short-span bridges. When they fail, communities are cut off. We design each crossing for the water it must carry and build it as part of the road that runs over it.
Our civil engineering team handles the hydraulic sizing, foundations, reinforced concrete and the approaches, with headwalls, wingwalls and scour protection so the crossing is not undermined in the first heavy rain.
Photographs on this page are licensed stock images, not WCE sites.
Scope
- 04.1Site survey and catchment assessment
- 04.2Hydraulic and structural design
- 04.3Temporary diversion of water and traffic
- 04.4Excavation and foundations
- 04.5Reinforced concrete box and pipe culverts
- 04.6Short-span bridge decks
- 04.7Headwalls, wingwalls and scour protection
- 04.8Approach roads and guard rails
How the job runs
Stage by Stage, With a Check at Each
The work breakdown for this service, and what we check before the next stage starts.
- 01
Survey
Stream levels, flood marks and ground conditions recorded
- 02
Design
Opening sized for the design flow
- 03
Diversion
Water and traffic kept moving safely during the works
- 04
Foundations
Formation inspected before concrete
- 05
Structure
Reinforcement and formwork checked before each pour
- 06
Protection
Scour protection and wingwalls in place
- 07
Approaches
Levels matched to the road, guard rails fixed
What you receive
Paperwork You Can Check
- Design drawings and calculations
- Bill of quantities
- Method statement for diversion
- Concrete test results
- As-built drawings
- Handover report
Do you build culverts as a separate job?
Yes. Culverts and drainage crossings can be a stand-alone contract, or part of a road job. Either way we start from the flow the crossing has to carry.
Can traffic keep moving while you work?
Usually. We plan a diversion or build the crossing in halves, and agree it with the road owner and the assembly before work starts.

Request a quote
Request a Quote for Bridges and Culverts
The consultation and the quotation are free. Tell us the project, the site and the timeline, and the same team takes it from the first meeting to handover.